Submit a Project Specification

Arcon Overseas Ltd. 12 Relton Mews, London SW7 1ET United Kingdom
T. +44 (0) 20 7225 1411  F. +44 (0) 20 7225 1811  E. enquiries@arcon-aquapro.com

 
   
   
1. Your Details  
* *
*
* *
* *
*
* *
   
   
2. Project Details  

Eg: 37 43' 22.51" N, 119 38'00.60 W (Download Google Earth)
 
   
   
3. PHYSICAL CHARACTERISTICS & FLOW
3.1. Rubber Bladder
   
3.2. Foundation  
 
 
   
3.2.1 Foundation Type & Shape  
   
3.2.2 Foundation Width & Height  
Foundation Width & Height
Foundation Width (Wf)
Foundation Height (Hf)
   
3.2.3 Foundation & Rubber Dam Nominal Height, Length & Slope
This diagram in positive flow direction  
Span Dimensions
  Span 1 Span 2 Span 3 Span 4 Span 5 Span 6
Rubber Dam Nominal Height (H0)
Rubber Dam river bed length (L0)
Side Slope Angle 1:nL (V:H) left
Side Slope Angle 1:nR (V:H) right
Side Slope or Pier Height (HBL) left
Side Slope or Pier Height (HBR) right
   
Total Length of Foundation (L)
   
3.2.4 Elevations  
   
3.2.5 Water Flow & Height
Water Flow and Height
Maximum Overflow Height (hu)
Maximum Tail Water Height (hd)
Recess:
Recess Depth: River Bed (h1)
 
 
   
   
4. Environmental Conditions  
 
Minimum Ambient Air Temperature Maximum Ambient Air Temperature
 °C  or 
 °F
 °C  or 
 °F
Daily River Discharge Maximum River Discharge
   
   
   
5. Mechanical & Control Equipment  
5.1 Mechanical  
 minutes
 minutes
 
 
Failsafe Mechanical Deflation System (recommended):If No, please state other Failsafe Deflation System

 
 
Measurements Inside Space
From riverbed corner (Lk)
In the datum fixing line direction
From datum fixing line (Lw)
In the water course direction)
Height from riverbed(Lh)
From riverbed corner (L)
In the datum fixing line direction
From datum fixing line (B)
In the water course direction)
Height from riverbed(H)
   
5.2 Control System Operation Requirements  
Dynamic Level Control:
The control system provides the flexibility to accurately control the upstream water level to a variable set point.
Fixed Level Control:
The control system is also capable of maintaining the bladder in either a fully inflated or fully deflated condition.
   
   
   
6. General  
Other existing or planned usage of area directly upstream and downstream of dam location
 
Enter security code:
 Security code
 
Fields marked *are required

About THIS FORM

This part fill-in, part multiple choice form can be completed with as much or as little project information as available and can be used for projects in all stages of development, whether it be for a budgetary price request, design enquiry or tender submittal. The information in this form will help us to evaluate the project requirements and client needs, as well as enable us to offer advice where deemed appropriate.